DTU P 06-002 PDF

Snow and Wind 65 rules defining the effects of snow and wind on constructions; The Eurocodes; The DTU P (code of practice for building work) of. Avec la norme homologuée NF DTU P, d’avril , remplace la norme .. neige et du vent sur les constructions et annexes (référence DTU P ). Refer to standards (DTU P //; NP EN ; NP EN ; NP EN ; DTU and ; DTU ) and to a ceramic tile.

Author: Golrajas Zulukasa
Country: Papua New Guinea
Language: English (Spanish)
Genre: Literature
Published (Last): 28 April 2018
Pages: 186
PDF File Size: 6.94 Mb
ePub File Size: 19.45 Mb
ISBN: 404-4-11801-684-8
Downloads: 4604
Price: Free* [*Free Regsitration Required]
Uploader: Faeramar

Each material carries different insulation properties. The figure below shows that insulation is far better with 55mm structured polycarbonate than with 16mm structured polycarbonate. M0 ” incombustible ” M1 ” non inflammable ” M2 ” hardly inflammable ” M3 ” mildly inflammable ” M4 ” easily inflammable” M5 ” very easily inflammable” These standards are progressively being replaced by European Standards — for construction products, these classifications are: Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for dti that traversed underground workings which were completed using BQ-size core.

Keeping the roof watertight: Fifty-three 53 drill holes and two 2 extensions of previous holes have been completed, for a total 15, metres.

Learn more In this section, you may consult information about roofing, cladding, our product lines as well quality and performance standards of materials. Select in-fill drilling on a 25 metre spacing will be conducted around intersections of economic interest.

Articles de quincaillerie – NF P Ferme portes – NF P a A few indications for building Reach Reach is the maximum allowed distance between rests for a given profile, panel or plate Figure 1. These three types of documents have a contractual application.

Back to main menu Resistance to fire classification Vtu France, there is a fire-resistance classification which defines 6 categories for materials: You can request verification for native languages by completing a simple application that takes only a couple of minutes.

P Normes – Dru A Forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, that the current 06-002 of and demand for gold will be sustained or will improve.

  LIBRO CRISTIANO CAUTIVANTE PDF

For more information, visit the CSTB website: Quality Control and Qualified Person. Two drill rigs have been in operation at the Marban deposit since August 30, There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ dgu from those anticipated in such statements.

The Mine Sequence, consisting of deformed mafic volcanic rocks, is approximately metres wide in this area and hosts several important sub-parallel sulphide and gold mineralized shear zones. Table of contents A. Forward Looking Statements and Information. K, a value which allows us to quantify the insulating capacity of each material. The zone where the building is situated — France is divided into 4 zones and each zone is given a different wind speed index The environment where the building is situated — the standard defines four types of environments urban, small towns, countryside, lakeside or seaside The impact of wind on the components of a roof are taken into account following several criteria: Back 06-0002 main menu Overlap Overlap is the transversal overlap between two insulated steel plates or two multi-skin polycarbonate plates.

– Google Drive

This standard is often required for new constructions. PVC has a high value for money and has an excellent resistance to fire rating M1. Polycarbonate is marked by a very high resistance to shocks, clearness, flexibility and excellent longevity.

These standards are progressively being replaced by European Standards — for construction products, these classifications are:. With respects to roofing or cladding materials, the most common measure is U which you can find on all Dhaze products.

Serrures multipoints anti-effraction – NF P A third drill rig is to be added by the end of January to carry out 5, metres of shallow 06-0002 at the Norlartic deposit. Back to main menu Simplified smoke extraction standards Smoke extraction from buildings and air circulation can happen through: For Dhaze profiles with tightening bonnets, we recommend one screw every 30cm for all polycarbonate thicknesses 16mm, 32mm or 55mm.

  AKAL TAKHT REHAT MARYADA PDF

The attached sketch shows the geological context of the Marban Block property, the position of the drill holes and a plan view of the Marban deposit.

NioGold is the project operator during 06-002 initial earn-in period see news release dated July 6, Term search Jobs Translators Clients Forums.

Learn more

dtuu In this section, you may consult information about roofing, cladding, our product lines as well quality and performance standards of materials. Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world’s most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions.

Reviewing applications can be fun and only takes a few minutes. Assay results were received for 21 drill holes. Moscow, Moskva, Russian Federation Local time: Sample lengths vary between 0. B – NF EN Post Your ideas for ProZ. In addition, 16 drill holes, for a total of 3, metres, are planned to test the area between the Marban and Norlartic deposits.

Reported intervals are in core lengths but are anticipated to approximate true widths, except where structural complexities occur, as the holes were drilled perpendicular to the principal local structural orientation. If you go beyond the defined reach, the panel, profile or plate may bend Figure 2. Several important mineralized zones are now recognised within the broad footwall shear, namely Zones T, A, C, C1 and C2. One drill rig was assigned to holes that required traversing the 0-002 mine underground workings, located between and metres vertical depth, in order to investigate the prospective shear zone located along the footwall south contact of the Mine Sequence.

Vote Promote or demote ideas.